AB426-ASA1,4,220
29.604
(7m) Bulk sampling activities. A person may take, transport, or
21possess a wild animal on the department's endangered and threatened species list
22without a permit under this section if the person avoids and minimizes adverse
23impacts to the wild animal to the extent practicable, if the taking, transporting, or
24possession does not result in wounding or killing the wild animal, and if the person
1takes, transports, or possesses the wild animal for the purpose of bulk sampling
2activities under s. 295.45.
AB426-ASA1, s. 8b
3Section 8b. 30.025 (1e) (title) and (a) of the statutes are repealed.
AB426-ASA1, s. 8d
4Section 8d. 30.025 (1e) (b) of the statutes is renumbered 30.025 (4m) (b) and
5amended to read:
AB426-ASA1,4,86
30.025
(4m) (b) This
section subsection does not apply to a proposal to construct
7a utility facility if the only permit that the utility facility is required to obtain from
8the department is a storm water discharge permit under s. 283.33 (1) (a).
AB426-ASA1, s. 8f
9Section 8f. 30.025 (1m) (intro.) of the statutes is amended to read:
AB426-ASA1,4,1710
30.025
(1m) Preapplication process. (intro.) Before filing
an a combined 11application
under this section for permits under sub. (1s) with the department in lieu
12of separate applications, a person proposing to construct a utility facility shall notify
13the department of the intention to file
an a combined application
under sub. (1s).
14After receiving such notice, the department shall confer with the person, in
15cooperation with the commission, to make a preliminary assessment of the project's
16scope, to make an analysis of alternatives, to identify potential interested persons,
17and to ensure that the person making the proposal is aware of all of the following:
AB426-ASA1,4,2219
30.025
(1m) (c) The timing of information submissions that the person will be
20required to provide in order to enable the department to participate in commission
21review procedures and to process the
combined application
for permits in a timely
22manner.
AB426-ASA1,5,824
30.025
(1s) (a) Any person proposing to construct a utility facility
to which this
25section applies shall may, in lieu of separate application for permits, submit one
1combined application for permits together with any additional information required
2by the department. The
combined application
shall for permits may be filed with the
3department at the same time that an application for a certificate is filed with the
4commission under s. 196.49 or in a manner consistent with s. 196.491 (3) and shall
5include the detailed information that the department requires to determine whether
6an a combined application
for permits is complete and to carry out its obligations
7under sub. (4). The department may require supplemental information to be
8furnished thereafter.
AB426-ASA1,5,1910
30.025
(2) Hearing. Once the applicant meets the requirements of sub. (1s) (a),
11the department may schedule the matter for a public hearing. Notice of the hearing
12shall be given to the applicant and shall be published as a class 1 notice under ch.
13985. The department may give such further notice as it deems proper, and shall give
14notice to persons requesting same. One copy of the
combined application
for permits 15shall be available for public inspection at the office of the department, at least one
16copy in the regional office of the department, and at least one copy at the main public
17library, of the area affected. Notwithstanding s. 227.42, the hearing shall be an
18informational hearing and may not be treated as a contested case hearing nor
19converted to a contested case hearing.
AB426-ASA1, s. 8L
20Section 8L. 30.025 (2g) (b) (intro.) of the statutes is amended to read:
AB426-ASA1,6,221
30.025
(2g) (b) (intro.) The department shall participate in commission
22investigations or proceedings under s. 196.49 or 196.491 (3) with regard to any
23proposed utility facility
that is subject to this section for which a combined
24application for permits is filed under sub. (1s). In order to ensure that the
25commission's decision is consistent with the department's responsibilities, the
1department shall provide the commission with information that is relevant to only
2the following:
AB426-ASA1,6,104
30.025
(4m) Procedure for a single permit application. (a) A person
5proposing to construct a utility facility for which not more than one permit is required
6may submit an application for that single permit with the department in the same
7manner as a combined application for permits may be submitted under sub. (1s). If
8the applicant elects to submit the application in the same manner as a combined
9application for permits, the procedures under this section that apply to a combined
10application for permits shall apply to that application for a single permit.
AB426-ASA1, s. 9
11Section
9. 30.12 (3m) (c) (intro.) of the statutes is amended to read:
AB426-ASA1,6,1412
30.12
(3m) (c) (intro.) The department shall issue an individual permit to a
13riparian owner for a structure or a deposit pursuant to an application under par. (a)
14if the department finds that all of the following
apply
requirements are met:
AB426-ASA1, s. 10
15Section
10. 30.123 (8) (c) of the statutes is renumbered 30.123 (8) (c) (intro.)
16and amended to read:
AB426-ASA1,6,1917
30.123
(8) (c) (intro.) The department shall issue an individual permit
18pursuant to an application under par. (a) if the department finds that
the all of the
19following requirements are met:
AB426-ASA1,6,20
201. The bridge or culvert will not materially obstruct navigation
,.
AB426-ASA1,6,22
212. The bridge or culvert will not materially reduce the effective flood flow
22capacity of a stream
, and.
AB426-ASA1,6,23
233. The bridge or culvert will not be detrimental to the public interest.
AB426-ASA1,7,6
130.133
(2) This section does not apply to riparian land located within the
2boundary of any hydroelectric project licensed or exempted by the federal
3government, if the conveyance is authorized under any license, rule or order issued
4by the federal agency having jurisdiction over the project.
This section does not apply
5to riparian land that is associated with an approval required for bulk sampling or
6mining that is required under subch. III of ch. 295.
AB426-ASA1, s. 12
7Section
12. 30.19 (4) (c) (intro.) of the statutes is amended to read:
AB426-ASA1,7,108
30.19
(4) (c) (intro.) The department shall issue an individual permit pursuant
9to an application under par. (a) if the department finds that all of the following
apply 10requirements are met:
AB426-ASA1, s. 13
11Section
13. 30.195 (2) (c) (intro.) of the statutes is amended to read:
AB426-ASA1,7,1412
30.195
(2) (c) (intro.) The department shall issue an individual permit applied
13for under this section to a riparian owner if the department determines that all of the
14following
apply requirements are met:
AB426-ASA1,7,1816
31.23
(3) (e) This subsection does not apply to a bridge that is constructed,
17maintained, or operated in association with mining or bulk sampling that is subject
18to subch. III of ch. 295.
AB426-ASA1,7,2120
44.40
(5) This section does not apply
as provided in s. 295.45 (6) or to any state
21agency action which is subject to
16 USC 461 to
470mm.
AB426-ASA1,7,2523
70.375
(1) (as) "Mine" means an excavation in or at the earth's surface made
24to extract metalliferous minerals for which a permit has been issued under s. 293.49
25or 295.58.
AB426-ASA1,8,92
70.375
(1) (bm) "Mining-related purposes" means activities which are directly
3in response to the application for a mining permit under s. 293.37
or 295.47; directly
4in response to construction, operation, curtailment of operation or cessation of
5operation of a metalliferous mine site; or directly in response to conditions at a
6metalliferous mine site which is not in operation. "Mining-related purposes" also
7includes activities which anticipate the economic and social consequences of the
8cessation of mining. "Mining-related purposes" also includes the purposes under s.
970.395 (2) (g).
AB426-ASA1,8,1411
70.38
(2) Combined reporting. If the same person extracts metalliferous
12minerals from different sites in this state, the net proceeds for each site for which a
13permit has been issued under s. 293.49
or 295.58 shall be reported separately for the
14purposes of computing the amount of the tax under s. 70.375 (5).
AB426-ASA1,8,2316
70.395
(1e) Distribution. Fifteen days after the collection of the tax under ss.
1770.38 to 70.39, the department of administration, upon certification of the
18department of revenue, shall transfer the amount collected in respect to mines not
19in operation on November 28, 1981, to the investment and local impact fund
, except
20that the department of administration shall transfer 60 percent of the amount
21collected from each person extracting ferrous metallic minerals to the investment
22and local impact fund and the department of revenue shall deposit 40 percent of the
23amount collected from any such person into the general fund.
AB426-ASA1,9,4
170.395
(2) (dc) 1. Each person intending to submit an application for a mining
2permit
under s. 293.49 or 295.47 shall pay $50,000 to the department of revenue for
3deposit in the investment and local impact fund at the time that the person notifies
4the department of natural resources under s. 293.31 (1)
or 295.465 of that intent.
AB426-ASA1,9,106
70.395
(2) (dc) 4. Six months after the signing of a local agreement under s.
7293.41
or 295.443 for the proposed mine for which the payment is made, the board
8shall refund any funds paid under this paragraph but not distributed under par. (fm)
9from the investment and local impact fund to the person making the payment under
10this paragraph.
AB426-ASA1,9,1912
70.395
(2) (fm) The board may distribute a payment received under par. (dc)
13to a county, town, village, city, tribal government or local impact committee
14authorized under s. 293.41 (3)
or 295.443 only for legal counsel, qualified technical
15experts in the areas of transportation, utilities, economic and social impacts,
16environmental impacts and municipal services and other reasonable and necessary
17expenses incurred by the recipient that directly relate to the good faith negotiation
18of a local agreement under s. 293.41
or 295.443 for the proposed mine for which the
19payment is made.
AB426-ASA1,9,2421
70.395
(2) (h) 1. Distribution shall first be made to those municipalities in
22which metalliferous minerals are extracted or were extracted within 3 years
23previous to December 31 of the current year, or in which a permit has been issued
24under s. 293.49
or 295.58 to commence mining;
AB426-ASA1, s. 17
1Section
17. 87.30 (2) of the statutes is renumbered 87.30 (2) (a) and amended
2to read:
AB426-ASA1,10,113
87.30
(2) (a)
Every Except as provided in par. (b), every structure, building, fill,
4or development placed or maintained within any floodplain in violation of a zoning
5ordinance adopted under this section, or s. 59.69, 61.35 or 62.23 is a public nuisance
6and the creation thereof may be enjoined and maintenance thereof may be abated by
7action at suit of any municipality, the state or any citizen thereof. Any person who
8places or maintains any structure, building, fill or development within any
9floodplain in violation of a zoning ordinance adopted under this section, or s. 59.69,
1061.35 or 62.23 may be fined not more than $50 for each offense. Each day during
11which such violation exists is a separate offense.
AB426-ASA1,10,1513
87.30
(2) (b) Paragraph (a) does not apply to a structure, building, fill, or
14development placed or maintained as part of a mining operation covered by a mining
15permit under s. 295.58.
AB426-ASA1,10,2317
107.001
(1) "Exploration mining lease" means any lease, option to lease, option
18to purchase or similar conveyance entered into for the purpose of determining the
19presence, location, quality or quantity of
metalliferous nonferrous metallic minerals
20or for the purpose of mining, developing or extracting
metalliferous nonferrous
21metallic minerals, or both
under ch. 293. Any lease, option to lease, option to
22purchase or similar conveyance entered into by a mining company is rebuttably
23presumed to be an exploration mining lease.
AB426-ASA1,11,4
1107.01 Rules governing mining rights. (intro.) Where there is no contract
2between the parties or terms established by the landlord to the contrary the following
3rules and regulations shall be applied to mining contracts and leases for the digging
4of
ores and nonferrous metallic minerals:
AB426-ASA1,11,146
107.01
(2) The discovery of a crevice or range containing
ores or minerals 7nonferrous metallic minerals shall entitle the discoverer to the ores or minerals
8pertaining thereto, subject to the rent due the discoverer's landlord, before as well
9as after the
ores or minerals nonferrous metallic minerals are separated from the
10freehold; but such miner shall not be entitled to recover any
ores or minerals 11nonferrous metallic minerals or the value thereof from the person digging on the
12miner's range in good faith and known to be mining thereon until the miner shall
13have given notice of the miner's claim; and the miner shall be entitled to the
ores or
14minerals nonferrous metallic minerals dug after such notice.
AB426-ASA1,12,10
16107.02 Mining statement; penalty. When there is no agreement between the
17parties to any mining lease, license or permit, to mine or remove
ore nonferrous
18metallic minerals from any lands in this state, regulating the method of reporting
19the amount of
ore nonferrous metallic minerals taken, the person mining and
20removing the
ore or ores nonferrous metallic minerals shall keep proper and correct
21books, and therefrom to make and deliver by or before the fifteenth day of each month
22to the lessor, owner or person entitled thereto, a detailed statement covering the
23operations of the preceding month. The statement shall show the total amount of
24tons or pounds of each kind of
ore nonferrous metallic minerals produced; if sold, then
25to whom sold, giving the date of sale, date of delivery to any railroad company,
1naming the company, and the station where delivered or billed for shipment; the
2name and address of the purchaser; the price per ton at which sold and the total value
3of each kind of
ore nonferrous metallic minerals so sold. The books shall be always
4open to any owner, lessor, licensor or stockholder, if the owner, lessor or licensor is
5a corporation, and to any person or stockholder interested in any such mining
6operations, for the purpose of inspection and taking copies thereof or abstracts
7therefrom. Any person and every officer, agent or employee of any thereof, who
8violates this section, or who makes any false or incomplete entries on any such books
9or statements, shall be fined not less than $100 or imprisoned in the county jail for
10not more than 3 months or both.
AB426-ASA1,12,21
12107.03 Conflicting claims. In case of conflicting claims to a crevice or range
13bearing
ores or nonferrous metallic minerals the court may continue any action to
14enforce a claim or grant any necessary time for the purpose of allowing parties to
15prove up their mines or diggings if it satisfactorily appears necessary to the ends of
16justice. In such case the court or judge may appoint a receiver and provide that the
17mines or diggings be worked under the receiver's direction, subject to the order of the
18court, in such manner as best ascertains the respective rights of the parties. The
ores
19or nonferrous metallic minerals raised by either party pending the dispute shall be
20delivered to the receiver, who may, by order of the court or judge, pay any rent or other
21necessary expenses therefrom.
AB426-ASA1,13,9
23107.04 Lessee's fraud; failure to work mine. Any miner who conceals or
24disposes of any
ores or nonferrous metallic minerals or mines or diggings for the
25purpose of defrauding the lessor of rent or who neglects to pay any rent on
ores or
1nonferrous metallic minerals raised by the miner for 3 days after the notice thereof
2and claim of the rent, shall forfeit all right to his or her mines, diggings or range; and
3the landlord after the concealment or after 3 days have expired from the time of
4demanding rent, may proceed against the miner to recover possession of the mines
5or diggings in circuit court as in the case of a tenant holding over after the
6termination of the lease. If a miner neglects to work his or her mines or diggings
7according to the usages of miners, without reasonable excuse, he or she shall likewise
8forfeit the mines or diggings and the landlord may proceed against the miner in like
9manner to recover possession of the mines or diggings.
AB426-ASA1,13,22
11107.11 Account of ore nonferrous metallic minerals received. Every
12person operating a metal recovery system and every purchaser of
ores and 13nonferrous metallic minerals shall keep a substantially bound book, ruled into
14suitable columns, in which shall be entered from day to day, as
ores or nonferrous
15metallic minerals are received, the following items: the day, month and year when
16received; the name of the person from whom purchased; the name of the person by
17whom hauled and delivered; name of the owner of the land from which the
ores or 18nonferrous metallic minerals were obtained, or if not known, the name of the
19diggings or some distinct description of the land. The bound book shall be kept at the
20furnace or at the usual place of business of such person or purchaser or his or her
21agent in this state, and shall be open to authorized representatives of the department
22of revenue at reasonable times for inspection and taking extracts.
AB426-ASA1,14,5
24107.12 Penalty. If any person operating a metal recovery system or purchaser
25of
ores and nonferrous metallic minerals or the agent of any such person or purchaser
1doing business fails to keep such a book or to make such entries as required under
2s. 107.11 or unreasonably refuses to show the book for inspection or taking extracts
3or makes false entries in the book he or she shall forfeit $10 for each offense, one-half
4to the use of the prosecutor; and each day such failure or refusal continues shall be
5deemed a distinct and separate offense.
AB426-ASA1,14,187
107.20
(1) Any provision of an exploration mining lease entered into after April
825, 1978, granting an option or right to determine the presence, location, quality or
9quantity of
metalliferous nonferrous metallic minerals shall be limited to a term not
10exceeding 10 years from the date on which the exploration mining lease is recorded
11in the office of the register of deeds of the county where the property is located, except
12that any provision of an exploration mining lease entered into after April 25, 1978,
13granting an option or right to determine the quality and quantity of
metalliferous 14nonferrous metallic minerals under a prospecting permit shall be limited to a term
15not exceeding 10 years from the date that the lessee applies for a prospecting permit
16under s. 293.35, if the lessee applies for the prospecting permit within 10 years from
17the date on which the exploration mining lease is recorded in the office of the register
18of deeds of the county where the property is located.
AB426-ASA1,14,2420
107.20
(2) Any provision of an exploration mining lease entered into after April
2125, 1978
, granting an option or right to develop or extract
metalliferous nonferrous
22metallic minerals shall be limited to a term not exceeding 50 years from the date on
23which the exploration mining lease is recorded in the office of the register of deeds
24of the county where the property is located.
AB426-ASA1,15,5
1107.30
(8) "Mining" or "mining operation"
has the meaning set forth in s. 293.01
2(9) means all or part of the process involved in the mining of metallic minerals, other
3than for exploration or prospecting, including commercial extraction,
4agglomeration, beneficiation, construction of roads, removal of overburden, and the
5production of refuse.
AB426-ASA1,15,197
107.30
(15) "Prospecting"
has the meaning set forth in s. 293.01 (18) means
8engaging in the examination of an area for the purpose of determining the quality
9and quantity of minerals, other than for exploration but including the obtaining of
10an ore sample, by such physical means as excavating, trenching, construction of
11shafts, ramps, and tunnels and other means, other than for exploration, which the
12department of natural resources, by rule, identifies, and the production of
13prospecting refuse and other associated activities. "Prospecting" does not include
14such activities when the activities are, by themselves, intended for and capable of
15commercial exploitation of the underlying ore body. The fact that prospecting
16activities and construction may have use ultimately in mining, if approved, does not
17mean that prospecting activities and construction constitute mining within the
18meaning of sub. (8), provided such activities and construction are reasonably related
19to prospecting requirements.
AB426-ASA1,15,2321
107.30
(16) "Prospecting site"
has the meaning set forth in s. 293.01 (21) means
22the lands on which prospecting is actually conducted as well as those lands on which
23physical disturbance will occur as a result of such activity.
AB426-ASA1,16,7
1160.19
(12) The requirements in this section shall not apply to rules governing
2an activity regulated under ch. 293
or subch. III of ch. 295, or to a solid waste facility
3regulated under subch. III of ch. 289 which is part of an activity regulated under ch.
4293
or subch. III of ch. 295, except that the department may promulgate new rules
5or amend rules governing this type of activity, practice or facility if the department
6determines that the amendment or promulgation of rules is necessary to protect
7public health, safety or welfare.
AB426-ASA1, s. 33r
8Section 33r. 196.491 (3) (a) 3. b. of the statutes is amended to read:
AB426-ASA1,16,229
196.491
(3) (a) 3. b.
Within 20 days after After the department provides a listing
10specified in subd. 3. a. to a person, the person shall apply for the
applicable permits
11and approvals identified in the listing. The department shall determine whether an
12application under this subd. 3. b. is complete and, no later than 30 days after the
13application is filed, notify the applicant about the determination. If the department
14determines that the application is incomplete, the notice shall state the reason for
15the determination. An applicant may supplement and refile an application that the
16department has determined to be incomplete. There is no limit on the number of
17times that an applicant may refile an application under this subd. 3. b. If the
18department fails to determine whether an application is complete within 30 days
19after the application is filed, the application shall be considered to be complete. The
20department shall complete action on an application under this subd. 3. b. for any
21permit or approval that is required prior to construction of a facility within 120 days
22after the date on which the application is determined or considered to be complete.
AB426-ASA1, s. 34
23Section
34. 196.491 (4) (b) 2. of the statutes is amended to read:
AB426-ASA1,17,624
196.491
(4) (b) 2. The person shows to the satisfaction of the commission that
25the person reasonably anticipates, at the time that construction of the equipment or
1facilities commences, that on each day that the equipment and facilities are in
2operation the person will consume no less than 70% of the aggregate kilowatt hours
3output from the equipment and facilities in manufacturing processes at the site
4where the equipment and facilities are located
or in ferrous mineral mining and
5processing activities governed by subch. III of ch. 295 at the site where the equipment
6and facilities are located.
AB426-ASA1,17,208
281.65
(2) (a) "Best management practices" means practices, techniques or
9measures, except for dredging, identified in areawide water quality management
10plans, which are determined to be effective means of preventing or reducing
11pollutants generated from nonpoint sources, or from the sediments of inland lakes
12polluted by nonpoint sources, to a level compatible with water quality objectives
13established under this section and which do not have an adverse impact on fish and
14wildlife habitat. The practices, techniques or measures include land acquisition,
15storm sewer rerouting and the removal of structures necessary to install structural
16urban best management practices, facilities for the handling and treatment of
17milkhouse wastewater, repair of fences built using grants under this section and
18measures to prevent or reduce pollutants generated from mine tailings disposal sites
19for which the department has not approved a plan of operation under s. 289.30
or s.
20295.51.